Decoration design description

First, design basis:
1 According to the room designated by Party A for the studio, confirm the layout and related plans, renderings, etc.
2 State-related TV studio building decoration engineering design specifications, procedures, design scale and scope:
1 This renovation project is Zhuanglang County Radio and Television Bureau Studio.
2 This decoration project is designed as a multifunctional room decoration design.
Third, the design elevation and positioning and other:
1 The relative design elevation of the decoration project + 0.000 building equipment completes the elevation. Compared with the original building elevation, according to the corresponding improvement of the floor decoration materials, the positioning details are shown in the construction drawings.
2 The facade of the decoration project design, the size of the sample image is the finished surface size, if the site has a smaller access, can be adjusted.
3 The main dimensions of this renovation project design are in millimeters and the elevation in meters.
Fourth, fire prevention requirements:
1 In accordance with the requirements of the building fire protection design specification, non-combustible materials and non-flammable materials shall be actively used in the design of this renovation project.
2 All grades of concealed wooden structures must have a first-grade finish fire retardant coating. Flammable surfaces should be flame retarded.
3 In addition to the individual interior design with contradictory adjustment positions, smoke alarm systems, conventional fire protection systems, and automatic sprinkler systems retain the original fire design.
Fifth, moisture, rust, noise reduction, sound insulation processing:
1 To prevent the deformation of wood structure caused by moisture intrusion, corrosion, if necessary, brushing asphalt paint
2 The surface of the steel structure needs to be treated with red rust-proof lacquer, and galvanized parts are used for bolts, ferrules, and gaskets.
3 When the wooden grille is empty, the sound-absorbing cotton is stuffed to ensure sound absorption and sound insulation.
Six, equipment installation:
1 heavy-duty lamps need to be hung on the top plate, not connected with ceiling keel
2 Light fixtures, etc. can be hung on the main keel of the ceiling, but must be reinforced
3 The installation of other equipment shall ensure the decoration effect under the premise of avoiding tuyere, spray, smoke and so on.
Seventh, wall engineering:
1 In this design drawing, the wall should pay attention to sound insulation, silencer
2 During the construction of the microporous aluminum plate on the wall, the installation position of the wood keel and the light steel keel is accurate, the connection is firm and no looseness, the soundproof cotton is properly placed, and the keel is correctly selected and meets the product requirements.
3 micro-aluminum plate surface smooth, clean, cover the electrical box position accurate, set flat cut.
4 microporous aluminum plate joints, straight, in line with relevant regulations. Strictly bound with the keel.
5 In the construction process of the wall aluminum-plastic panel and red walnut panel, the wooden keel, the position is accurate, the connection is firm and no loose, the high-density board should be flat, the nail cap should not be exposed, and the sound-proof cotton should be fixed properly. The correct selection of keel and meet product requirements.
6 During the veneer construction of the wall aluminum-plastic panel and red walnut mortar surface, the joints are flat, straight, and in the same direction as the wood grain, and the aluminum-plastic panels are aligned in the same direction, and attention is paid to the protection of the surface.
7 Select all wood species, grade, quality, skeleton moisture content must comply with the "forest structure construction and acceptance specification" "GBJ206-831" the relevant provisions, and in accordance with the provisions of the architect's decoration design fire prevention
8 micro-hole aluminum plate, red walnut plate cover cutting electrical box position is accurate, set flat cut.
Eight, ground engineering:
1 laying carpet surface must be smooth, smooth, dry, dense, clean. There must be no cracking, peeling and sanding.
2 Laying carpets should be nailed to them, flat rubber pads, pay attention to seams should comply with relevant regulations, pay attention to complete the protection of the surface.
Nine, Tu Yan project:
1. The base must have a smooth surface, vertical facades, smooth seams, square corners, and precise dimensions.
2 In order to meet the quality requirement of the plastering base for plastering part of the paint, the plastering has reached the standard of high plastering. The gray surface has uniform color and surface, and the yin and yang angles are straight and the dimensions are accurate.
3 The coating selected for this project is a special coating. The number of brushing passes shall be subject to the requirements of the supplier.
4 The brushing thickness is the same, the color is consistent and the brushing surface is clean and free of pollution.
5Unfortunately, the temperature requirement during construction of the paint project is not less than 10 degrees Celsius, and the relative humidity is not more than 60%.
6 When the paint is applied, the surface is fully dried. Whenever the paint is applied, it should be done after the paint is dried again.
7 When painting, it should be horizontal and vertical, criss-cross, even and consistent should pay attention to clear forest pattern, no leakage brush, peel marks, falling, wrinkled skin phenomenon. Smooth and unobstructed feel, consistent color, no brush pattern.
Tenth, construction precautions:
1 Strict implementation of the current national regulations for construction and acceptance during construction
2 It is not allowed to arbitrarily change the design drawing and material selection. When it is necessary to change it, it can contact the designer in time according to the requirements of the construction party.
3 Coordination solution: The details are not coordinated by the designer on site.
4 In order to ensure the design effect, material selection of important materials shall be based on design requirements. Construction shall strictly comply with the requirements of relevant fire codes. The concealed works may be closed only after acceptance by Party A.
5 In order to facilitate the construction, internal practices can be properly adjusted according to common practices while ensuring that the decorative effect is not changed, but it must be ensured to be safe and reliable.

Villa design entrance decoration paint TV decoration decoration design electrical decoration ceiling renderings interior decoration design renderings interior decoration effect map grille lamp

Hollow Wood Plastic Composite Decking

Wood Plastic Composite Outdoor Decking,Decking Board Wood Plastic Composite,Decking Floor Wood Plastic,Wood Plastic Black Composite Decking

Linyi Hmbyan International Trading Co.,Ltd , https://www.hmbyandecor.com