High-rise residential safety production management

(I) Safety Management Policy:

The safety management policy is safety first and prevention is the priority.

(B) Security Organization Guarantee System

With the project manager in charge, the safety assurance system is composed of managers from various fields such as project deputy managers, safety managers, and professional branches.

Security Organization Guarantee System

(III) Safety Management System

1. Safety Technology Submission System: According to the requirements of safety measures and the actual situation on the site, all levels of management personnel shall personally perform written submissions step by step;

2. Pre-class inspection system: The responsible engineer must supervise and inspect the construction party and the professional branch company to check whether the safety protection measures have been checked;

3 , large and medium-sized machinery and equipment to implement the acceptance system, where no experience will not be put into use;

4. On Monday, the Ministry of Management shall organize all workers to conduct safety education on Mondays, summarize the problems in the previous week's security, and make necessary disclosures for the safety priorities and precautions of this week, so that the majority of workers will have a good idea. , From the moment of consciousness, the security string is tightened.

5. Regular inspections and rectification of hidden troubles: The manager's department shall organize a safety inspection every week, and must determine the measures, the fixed time, the rectification of the personnel, and make a record of the rectification and elimination of hidden dangers.

6. The management personnel and special operating personnel shall implement the annual review system. Each year, the company shall carry out unified organization, strengthen the safety assessment of construction management personnel, enhance safety awareness, and avoid illegal command;

7. Implement the system of production safety penalty and accident reporting;

8. Emergency stop system: Once there is a dangerous situation that threatens the safety of life and property of employees, we must immediately stop work, report the company at the same time, and take timely measures to eliminate dangerous situations;

9. License-induction system: Special types of jobs must hold on-the-job operation permits, and unauthorized operation is strictly prohibited.

(d) Safety Management

1. The project manager department is responsible for the safety production of the entire site and strictly follows the relevant safety measures stipulated in the construction organization design and construction technical measures;

2. The professional engineer shall inspect the subcontractors and professional branch companies, earnestly do a good job of writing the sub-project engineering safety technology, and be handed over to the endorser to sign and approve;

3. The weak parts and links should be controlled in the construction process, especially the large-scale construction equipment that comes with the contractor, such as the equipment entry inspection, installation and daily operation, should be strictly controlled and supervised, where the equipment performance does not meet Safety requirements must not be used;

4. The change of protective equipment must be approved by the safety director of the project manager department. After the change, there must be corresponding effective protective measures. After the operation is completed, it shall be restored according to the original standard. All written data shall be kept by the safety director of the manager.

5. Make necessary and reasonable investment in safe production and investment. Important labor protection products must be purchased from designated manufacturers.

6. Analyze security difficulties and determine safety management difficulties

Before the start of each major construction phase, analyze the construction conditions, construction characteristics, and construction methods at this stage, predict construction safety difficulties and hidden accidents, and determine management points and pre-control measures. During the construction phase, the security difficulties are concentrated in:

( 1 ) High-rise construction fall protection, three-dimensional cross-construction against object strikes ;

( 2 ) Scaffolding engineering safety measures ;

( 3 ) The safety of various electric tools for construction use;

( 4 ) tower crane safety measures, etc.

( 5 ) On-site firefighting and other work.

(e) Formulate basic standards for safety protection at the construction site.

Formulate basic standards for safety protection at the construction site, such as: use of protection standards; safety protection standards for temporary use of electricity during construction; safety protection standards for various types of construction machinery and equipment; and management standards for fire protection work on construction sites.

1. Strengthen the management of fire prevention and fire prevention, strengthen the management of fire sources, and designate special personnel to manage flammable and explosive materials. Welding work must be cleaned of the surrounding flammable materials. Fire-fighting tools and equipment should be fully equipped and installed in place, and designated personnel should be responsible for cleaning up regular inspections.

2. All construction personnel must wear a safety helmet when entering the site.

3 , horizontal safety net settings

Starting from the second floor, a safety net with elevated construction height is erected on the overall lifting scaffolding. It is required that the net rope is not broken and rooted firmly and tightly. The rods are made of steel pipes with a mesh width of not less than 3m .

4 , transfer table settings

During the construction of the structure and after the completion of the structure, some large-sized materials (long steel pipes, formwork, etc.) cannot be lifted from the wall to the room or transferred to the upper layer, and the material transfer table should be installed. The transfer table adopts steel pipe braced erection with safety barriers on both sides, 900-1000mm high .

5 , hole safety protection

All wellheads must be equipped with safety signs, warning lights at night, and 900 to 1200 high barriers at the entrance .

6 , safe passage

In the construction site, the personnel set up safe passage through more roads.

The information in this article comes from the Internet and was reorganized and edited by China Rescue Equipment Network.

Unsheathed PMMA Fibre

From sending critical data to enhancing products with beauty, fiber optics are all around us.

We use fiber optic cable light in many diverse applications. From delivering phototherapeutic light to treat babies with Jaundice, or allowing spinal surgeons to visualize deep in cavities, to backlighting components found in automobiles, keyboards, and even shoes.

DSPOF supplies high quality single strand unsheathed PMMA fiber optic tube. If you wanan customized any size fibers,please contact with us.



Fiber Optic Tube,Fibre Optic Cable Light,Fiber Optic Cable Light,Fibre Optic Cable For Lighting

Jiangxi Daishing POF Co.,Ltd , https://www.jxopticfibrelight.com