Three trees Painted floor tiles Painted marble Windows Doors Furniture decoration Looking for fit-out companies Flooring tiles Kitchen doors Toilets Bathrooms Bathroom tiles Bathroom doors Outdoor Peacock Landscape Lights,Outdoor Peacock Lawn Lights,Simulation Peacock Lights,Peacock Landscape Garden Lights Sichuan Kangruntengpu Photoelectric Technology Co., Ltd. , https://www.krtoplighting.com
2. The toilet and the kitchen floor are closed for 24 hours (requires the developer to complete this task).
3. Chiseling trough, hydropower reform and acceptance.
4. Sealed trough concealed hydropower renovation project, closed water test without leakage began to do waterproofing.
5. Bathroom, kitchen wall floppy disk.
6. Woodworking approach, hanging ceiling, plaster angle line.
7. Package door cover, window cover. Make wooden cabinet frame.
8. Simultaneous production of various wooden doors, styled doors and flat pressure.
9. Wooden panel brush dustproof paint (clean oil).
10. The windowsill marble table leveling laying.
11. Wood veneer paste, line production and fine installation.
12. Wall base treatment, grinding, leveling.
13. At home, the door seams are pasted with stickers (protective edges).
14. Wall oil ICI at least three times.
15. Furniture paint enters the field, nail holes, and paint.
16. Deal with corners, laying floor tiles, solid wood or composite wood floors, waterproof marble strips, baseboards.
17. Luminaires, sanitary ware, handles, door lock installation and commissioning.
18. Clean up the hygiene, repair the floor tiles and remove the floor.
19. Initial inspection of interior decoration company.
20. The tripartite appointment time is formally accepted and delivered to the owner.
1. Enter the market, remove walls, and build walls.