Keywords: Home decoration construction supervision Entrance decoration restaurant decoration home decoration marble cement TV decoration house decoration cabinet kitchen cabinet door bathroom ceiling material bathroom ceiling villa map villa drawing apartment decoration We are specialized in the production of rotor pumps and homogeneous pumps. The production capacity reaches 18,000 units/year. Our pumps can transfer medium with viscosity up to 1,000,000cps, with a maximum flow rate of 400m3 / h (Capacity of 30L/r). Lobe Pumps In Chemical Fiber/ Rotor lobe pumps in Chemical Fiber/Rotary lobe pumps in Chemical Fiber NINGBO DURREX PUMPS CO.,LTD , https://www.durrexlobepump.com
How to change the current pipeline laying method, experts recommend the following methods: 1. The pipeline grooving along the wall foot, after laying row, without cement closed, directly nailed on the baseboard closed, in the future, as long as the maintenance of tearing skirting Yes. At present, the pvc baseboard on the market is generally less than ten yuan per meter, and the loss is not great. In this way, because pipelines have to go at right angles, waste of pipeline materials is more cost-effective than knocking out expensive floors and marbles in the future. 2. If you are decorating a villa or an old apartment house, you may wish to keep the traditional mirror line. The pipeline is buried under the mirror line and maintenance is more convenient. 3. As far as possible, the kitchen and toilet pipes are to be walked in the ceiling, and the vertical pipes are best closed with a removable moisture-proof plate or a stainless steel cabinet.
Applications:
Pectic slurry, PVA, vinylon slurry, acrylic slurry, ammonia slurry, polyester slice, terylene, polypropylene fiber, rayon, functional fiber, etc.
Partners:
Sateri, Lenzing, ADITYA Birla, Solvay, BASF, DUPONT,LENZING, Tangshan Sanyou......
At present, in home renovations, water pipes, wires, telephone lines, cable TV lines, etc. are generally not buried under the floor, they are buried in walls, covered with cement, and then surface decoration. This totally closed way has brought great obstacles to the maintenance of pipelines in the future. First of all, it is required to retain the complete drawing of the pipeline, otherwise it is impossible to start. Secondly, repair and replacement must completely destroy the surface decoration, which not only takes time and effort but also causes waste of materials. If the floor or wall is covered with special materials, such as marble, precious wood, etc., it is almost impossible to reconfigure the same.