1, do not do the head of the shoe partition, leave a little space so that the gray shoes can leak to the bottom, installed above the sink and gas stove lights. When determining the location of a bathroom floor drain, you must first think about it and measure the size. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point regardless of how the brick is inclined. Do not make headboards of shoes 2, bathroom, air conditioning socket are not designed switch. Especially bathroom electric water heaters, with a two-stage switch with a plug is appropriate. If you want to turn off the electric heat, it is dangerous to pull the plug 3, on the face of the brick corner of the treatment method, in the final analysis is to see the level of workers. If the masonry workers are in good condition and the tools for grinding tiles are good, they should not hesitate to grind the 45-degree angle. From the effect point of view, as long as the grinding is good, the practice of grinding the angle of 45 degrees is the most beautiful! If the worker's level is really not good, then you still have to choose to use an angle strip, because the bad 45-degree angle grinding method is not as good as the effect of the Yang-angle strip. 4. It is also very important to test the water pressure after the water pipes are arranged. During the test, everyone must be present, and the test time should be at least 30 minutes. The conditions are permissible, preferably one hour. Ten kilograms of pressurization, and finally there is no reduction to pass the test. 5, plastic steel doors must be considered when the size of the plastic steel door frame protruding wall, informed the installation staff, making the final door frame and finished tile wall is flat, so both beautiful and good hygiene. 6, the carpentry door package and the mason's tiling is also to match, when the package door, we must consider the following ground (door on both sides of the ground on either side) whether it is still tile or other cement mortar leveling thing, Because if the door cover is nailed before the tile, it is always wrapped to the ground. In the future when cement is used, if the cement and the door cover are stained, it will cause the door cover wood to absorb water and mold. 7, the mattress and the bed board must be breathable. Bed board is generally best with fir board 8, do paint as much as possible with paper tape 9, buy luminaires should pay attention: generally try to use glass, stainless steel, copper or wood (shelf), generally do not buy what plating on the top of what other plating ah, what paint ah and the like, easy to fade. 10, basins try to use ceramic basins, glass basins are difficult to engage in health 12, waterproof must be done, we must test the water! 13, many of the construction of the verbal agreement has become a gap in the checkout, must be written in black and white, the increase and decrease of the project must be sure to ask the price, write it out! 14. If the ground is installed on the ground, the ground must be re-doed to re-level the cement layer. 15, the kitchen door, or to decorate the carpenter to do wooden hanging rails as well. 16, the living room as much as possible to install the power plug. 17, outside the bathroom shower or partition. It is not practical to pull a shower curtain. It is practically inconvenient and the water flows across the floor. 18, to do the material of the door and door frame to choose the fine materials of wood. 19, before installing the cabinet must confirm that your home waterway is OK. 20, kitchen and floor tiles must not pick white. 22, the number of living room lighting should not be too much, simple as well, otherwise like a lighting shop! 12, waterproof must be done, we must test the water! 13, many of the construction of the verbal agreement has become a gap in the checkout, must be written in black and white, the increase and decrease of the project must be sure to ask the price, write it out! 14. If the ground is installed on the ground, the ground must be re-doed to re-level the cement layer. 15, the kitchen door, or to decorate the carpenter to do wooden hanging rails as well. 16, the living room as much as possible to install the power plug. 17, outside the bathroom shower or partition. It is not practical to pull a shower curtain. It is practically inconvenient and the water flows across the floor. 18, to do the material of the door and door frame to choose the fine materials of wood. 19, before installing the cabinet must confirm that your home waterway is OK. 20, kitchen and floor tiles must not pick white. 22, the number of living room lighting should not be too much, simple as well, otherwise like a lighting shop! 33. After the door covers are made, the plasterer begins to install the plaster lines and the wall ash project. The walls of my home were relatively flat, and 2-3 lanes would be sufficient. When the batch of ash is approved once a batch of ash, then brush the primer, brush after polishing, and finally with ICI brush finish two times, the entire wall looks smooth and smooth, really good. After the wall ceiling project was completed, the woodworking masters began to make wardrobes. The closet is made of 18cm Weiye brand big core board, and then the outer panel is decorated, although there is no furniture store to buy so beautiful, but durable, the quality should be better than to buy. I am not afraid to stand on the cabinet's board. I am afraid I will not be able to buy it. The backboard is also relatively thick and it is very thin to buy. 34, other students must pay attention to the following points when tiling: 1 It is best that you can be on site. 2 Partially imperfect tiles can make workers stick to some invisible positions in the future, such as cabinets, washbasins, mirrors, etc., but also pay attention to tiles, waist tiles, etc. Do not be attached to the above position by workers, or what will you do in the future? Can not see, but also spend money. 3 before the wall tiles and floor tiles are affixed, the immersion time must be sufficient. 4 Be sure to plug the ground drain and prevent it from plugging. My family's floor drain was blocked because of the loss of cement. It took 30 to find the management office to clear and get a lot of small mud blocks. 5 people at the scene, workers will not waste tiles. My family was not at the scene when I was tiling, but later I went to see it and wasted a lot of bricks. It was heartbreaking and my bloody Mi Mi. 36, the bedroom's top light is best double-controlled, one by the door, one beside the bed, to save the big winter lying on the bed and turn off the lights. 37, the location of the socket must be considered good, height, interval. Even when I first hit the location of the cassette, I encountered a steel bar. After the box was placed, I found that it was just blocked by the TV cabinet, microwave oven, and desk. I had to move the first two furniture positions high and found that it was not only highly ergonomic, but also it could not be bought. Good stainless steel cabinet feet can only be customized aluminum feet. 38. It is only necessary to install one at a corner of the aisle, that is, bright and effective. 39. When the lamp was installed, the position of the table was not taken into account. Now the lamp is not in the middle of the table. 40, bathroom tiles do not use too prime, one is easy to dirty, and second, a long time too plain! 42, aluminum buckle board does not have to buy high prices, very cheap aluminum buckle board has far better than the effect of PVC, and then spend more money and can not see significantly different results. Buy aluminum buckle board to pay particular attention to the keel instead of the aluminum buckle board itself (the goal of the aluminum buckle board is not easy to do the hands and feet), the keel often will be finished ghost. 43, the color of the floor tiles is difficult to find satisfactory, I did not find, but two kinds of unsatisfactory color intertwined and then turn a 45-degree angle can reach my very satisfied results. This good idea was actually suggested by the bricklayer. 44, when the cabinet on the top of the balcony, then the back of the cabinet with a layer of foam plastic insulation and waterproof effect is very good. Balcony doors are best not to use the same type of fire board. The balcony environment is rather harsh. 45, if not suitable wood lines may be customized, customized quality seems to be better than the sample. And customized more personalized. 47, install the lock should pay attention to the lock tongue on some wax, crashed and then on the wax later. If there is no door stopper, be careful to prevent the handle from damaging the wall. 48, Parker floor is very good, I like it, the only thing to remind is that talking directly to the boss may be better than talking to the salesperson about the price. 49, matt paint is more beautiful than high light 50, if the decoration will use finished putty instead of talcum powder. 51, install the leakage protection device and the air switch junction box project can not be saved, but not on the outside to be placed indoors, the original would like to save the money will be on the outside of the old junction box used, the electrician is recommended to change indoors The new one now finds his suggestion very valuable. 52, leakage protection and air switch to use the brand name. Used "Merlin Gerin". It is also simple to buy genuine goods. Call the phone number of the headquarters of Merlin Gerin directly and then call the local branch number. 53, under the basin than the above table basin delicate, good-looking, good cleaning. With the basin mixer under the table should pay attention to, taking into account the thickness of the basin, the leading mouth to be longer. 54, the top corner of the wall without any modification is also very beautiful, but in advance to find painters at the stage and the painter clearly put forward. The top corner line helps to straighten the top corner line. 55. Before the surface treatment of putty on the cement surface of the inline trough is very important, and it is appropriate to use a clean ball to treat the unsturdy surface. 56. Plaster is suitable for making up large holes in the wall. Of course, if the hole is too large, cement is needed. 58. The cooking basin faucet must be able to be switched on and off with the back of the hand. The kind that must be used with fingers is not easy to keep clean. When the oil is on the hand, it is difficult to turn it. 59. The price of luxury automatic drying racks is too high. After comparison, some unfamous brands were found to be superior to the first-line brands in structure design, but the prices were much lower. 60, can consider using a metal socket installed on the ground, this socket is more than 100 expensive, but very convenient, usually flush with the ground, a foot can be popped out of the socket. Suitable for large living room. Or put it under the dining table in the dining room to insert the hot pot (to prevent the wires from moving around when moving back and forth) 62, bed starter (is it so called?). I bought a fabric bed for a professional bed company, and spent 350 yuan for such a thing. There is a handle at the end of the bed and the bed board will turn up to reveal the storage space underneath. It's great! 63, impractical double towel rack! At present, like the single pole use, basically no more towels will be put on the in-floor hanging bar. 64, I feel that the garbage can inside the cabinet is not practical enough. It is better to put it outside. Do not install door-type trash cans and countertop trash cans, and opening the doors in the summer can be stinky. It is better to put the trash can outside. 65. It's good to have a small cupboard next to the table. 66. As far as I am concerned, mop buckets are not very demanding in terms of performance. They can build one out of their own. Tiles or mosaics that match the surrounding environment are beautiful and save money. 67. The bathroom can be used to hang things. 68, the bathroom designed a small cup of clothing, no longer have to worry about taking a shower to get clean clothes. 69, washing machine drying is not very practical, in addition to the only yellow day of the year, but also huge. Thick clothes and bath towels are still not dry enough for the sun to disinfect. Even if it is overdrawn, you need to save some money. 71. It is really impractical to install light strips. The decoration has not been opened until now. When a guest comes in, it's just a spotlight on SHOW. I have forgotten to install this thing. Originally, it was romantic when she wanted to open PARTY. Now there are not many opportunities to open the lights. 72, the biggest experience is that in fact the decoration is as simple as possible, less pollution, less money, worry. 73, practical Dongdong: A well-designed storage room. 2 The sink for the washing of the north balcony. Distinguishes the washbasin from the bathroom and the kitchen's dishwashing and dishwashing bucket. 3 Toilets can be pulled out of the faucet. (The exception is TX, which is never washed in the basin). 4 Easy to clean floor and suitable cleaning tools. 5 kitchen countertop work lights. 74, buy a toilet must measure its own hole distance, or buy it and return it is really ... ... 75. After the kitchen tile is attached, it is best to measure the level before it is dried. See if the lowest point is a floor drain, and wait until it finishes and then wrap it with the decoration team and die a lot of cells. 76. The windowsill uses the pearl of the Great Wall, which is an 800X800 tile. Manufacturers cut edging and plastering. The pattern looks good also No radiation. 77. The size of the shower room in the bathroom must be large enough, and transparent glass should be used so that the shower will not appear cramped. 78, tile joints should not use white cement hook. Without a month it becomes black and it is ugly. As a result, he bought his own grout and hooked himself. 79, artificial stone under the cabinet should be under the backplane, after the installation found no, and now they did not dare to cut the meat on the top, promised to give me two months to install it is not installed (only to polish once) . 82. After the bathroom floor tile has been attached, test the water and if the water flow is relatively slow, rework it immediately. The family's water flow was relatively slow. At that time, my heart was a little soft. Now when I take a bath, I always have a little water, and the shower heads of our main guards are idle. Now I am wondering how to remedy them. 83, when you wash the basin, consider the relative position of the mirror, brushing the cup, and the towel rack. 84, when buying a mirror to consider the position of the mirror headlights, if you do not want to install mirror headlights, the size of the mirror should be able to cover the line reserved for the mirror headlights best. 85, put the washing machine on the balcony to be a small cabinet, easy to put some debris, such as debris inside the detergent. Both beautiful and practical 86, must stare upstairs to do waterproof .... or upstairs drop, get the wall cabinet, the wall is a mess.... 87, do not blindly follow the online buy, I later found that some of their own to bargain will be cheaper than group purchase. 88. A certain number of sockets, televisions, DVDs, etc., must be set on the TV background wall. You will find that the socket is not enough. 89. Before changing the waterway, consider what kind of washbasin you have in the future, such as the left or right basin, and where the influent and drain water should be located. Otherwise, only after the change did you find that the washbasin in the phase was not fit! 91, decoration of the construction process: (1) Enter the market, remove walls, and build walls. (2) The toilets and kitchen floors are closed for 24 hours (developers are required to complete this task). (3) Chiseling trough, hydropower reform and acceptance. (4) Embedding of the concealed hydropower project in the trunking, and the water-sealing experiment began without leakage to start the waterproofing project. (5) Toilets, kitchen wall magnets. (6) Carpentry approach, hanging ceilings, plaster casts. (7) package door cover, window cover. Make wooden cabinet frame. (8) Simultaneous production of various wooden doors, modeled doors and flat pressure. (9) Wooden panel brush dustproof paint (clean oil). (10) The windowsill marble countertops are levelled and laid. (11) Wood veneer paste, line production and fine installation. (12) Wall base treatment, grinding, leveling. (13) Houses are glued to the edge of the door (protection edge). (14) Wall oil ICI at least three times. (15) Furniture paint enters the field, repairs nails, and paints. (16) Treat corners, laying floor tiles, solid wood or composite wood floors, waterproof marble strips, baseboards. (17) Fixtures, fixtures, handles, door lock installation and adjustment. (18) Clean up the hygiene, fill the floor tiles and remove the floor. (19) Initial inspection of interior decoration company. (20) Formal acceptance of the three party appointments is delivered to the owner. Construction Acceptance Paint Cement Door Price Socket Decoration Design Living Room Wall Color Living Room Lamp Kitchen Door Decoration Find Decoration Company How Do You Decorate Living Room Decoration Cut Off Marble Dining Table Stainless Steel Towel Holder White Furniture Panel Furniture Doors Floor Tile Glass Table Glass Dining Table Kitchen Glass Sliding Door Cabinet Door Cabinet Doors Doors Doors Cabinets Cabinets for marble Cabinets for kitchen Wall tiles Glass doors Glass bricks Cabinets Marble tiles Glass Cabinets Cabinets Fabric beds Glass furniture Mirrors Front lamps Stainless steel Cabinets Glass cabinets Door cabinets Doors Cloths Curtains Kitchen cabinets Doors Cabinets Doors Tiles Toilet partitions Toilet doors Bathroom tiles Color bathroom wall tile bathroom door size bathroom washbasin bathroom size bathroom waterproof Escalator Spare Parts
OTIS Escalator
Spare Parts, Thyssen Escalator Spare Parts, KONE Escalator
Spare Parts, GiantKONE Escalator Spare Parts, ThyssenKrupp Escalator Spare
Parts, Schindler Escalator Spare Parts, XJ Schindler Escalator Spare Parts,
Xizi OTIS Escalator Spare Parts , Mitsubishi Escalator Spare Parts, Shanghai
Mitsubishi Escalator Spare Parts, Fujitec Escalator Spare Parts, Hitachi Escalator
Spare Parts, Toshiba Escalator Spare Parts, Hyundai Escalator Spare Parts, LG Escalator
Spare Parts, Sigma Escalator Spare Parts, Express Escalator Spare Parts,
GUANGRI Escalator Spare Parts, FUJI Escalator Spare Parts, BLT Escalator Spare
Parts, CANNY Escalator Spare Parts, SJEC Escalator Spare Parts, KOYO Escalator
Spare Parts, IFE Escalator Spare Parts
About Escalators
Part of the urban landscape
Visit any large department store, shopping mall, metro station, airport or stadium anywhere in the world and you are sure to find escalators carrying people quickly and safely to their destination. The escalator has become an integral part of the urban landscape.
CEP Elevator Company has been safely and efficiently moving people for 20 years. CEP is the world`s leading manufacturer of elevators, escalators, moving walks and people movers. With 30,000 installations and operations in more than 89 countries, it`s safe to say that the world rides on CEP.
Finding a safer solution
Designing a safe transition point-where passengers step on and off the escalator-was one of the major problems in creating a successful moving stairway. A number of methods had been attempted before CEP solved the problem.
The pursuit of innovation
CEP, in its tradition of innovation, has continued to refine the escalator since it pioneered its introduction.
Safety, quality and reliability
CEP was founded on the principle of safety. Today, CEP has one of the best safety records in the vertical transportation industry. The company works constantly to improve the safety of existing products and to implement new, safer technologies. CEP emphasizes a corporate policy of [safety first" and implements standardized procedures to ensure that every installation and service task is performed the safest way every time.
The escalator today-an array of options
CEP wrote history with the introduction of the escalator in 1995. Today, it continues to improve the product through ongoing innovation.
Escalator Spare Parts, Escalator Components,Escalator Parts CEP Elevator Products ( China ) Co., Ltd. , https://www.zjfullelevatorreplacement.com
11, hydropower reform to their own plans, asking them to open the line according to Cao. They looked at their lines and pressed Cao's lines. Each item must be checked and accepted.
21, the ceiling should pay special attention to wipe the putty before wiping Dulux
11, hydropower reform to their own plans, asking them to open the line according to Cao. They looked at their lines and pressed Cao's lines. Each item must be checked and accepted.
21, the ceiling should pay special attention to wipe the putty before wiping Dulux
32. Considering that the customized cabinets are good-looking, but not durable, after integrating the opinions and experiences of some students on the Internet, the cabinets are made of cement, with ceramic tiles on both inside and outside surfaces, marbles on the countertops, and cabinets and doors. Wood to do it. The cabinets thus made are durable and moisture proof. And spend not much. Many neighbors have said good things. This is not what I blow.
35. The length and height of a wall. If a bathroom has four walls, measure the length and height of each wall. Then deduct one more window and door area. Finally calculate the area of ​​the ground. After you have sized it, you can also get a shop selling tiles, and they will help you meet again. Plus 5 percent of the loss on the line.
41. Sockets should be installed more, furniture should be bought outside, and the ground should be considered to be resistant to dirty and dirty. The sample room should be looked at more, and the principle must be adhered to.
46. ​​The stainless steel feet used in bathroom cabinets are profiteering. To find some of the store's back, the price is cheap.
57. The back of the frosted glass must be protected from paint. It is difficult to clean!
61, storage room. Already TX has said, but I did not make the door, looks not very beautiful, the cabinet that puts clothes again is easy to be dirty.
70. I even made a laundry pool in the laundry room for hand washing. Originally thought less, so I bought a very cheap Teli. Unexpectedly, this laundry pool was so convenient that it became the washing area with the highest frequency in my home. What rags, socks, and towels are all washed inside, and most of the washing hands are there.
80. Don't believe the designer's confusion. Of course, you can visit several decoration companies and extract the real useful things from each design. The key is how you want to dress your home.
81. If the floor drains the original developer has already installed the "bowl" of stench, don't take it out.
90. Regarding the curtains, it is best for everyone to keep a copy of the size of their own. The owner must be able to describe the size of the curtain. If there is less, how is it? Or he looked at his cutting cloth.