The truss floor board has a lot of technical processes, which are closely related to the good labor organization. The following process can also be handled according to the actual situation on site. So how is this process handled? What is the process of the truss floor board? The truss floor board has a lot of technical processes, which are closely related to the good labor organization. The following process can also be handled according to the actual situation on site. Steal Cnc Milling Parts,Stamping Parts Stainless Steel Parts,Custom Metal Factory Deep,Deep Drawing Stamping Parts JIANGSU TONGDE INTERNATIONAL TRADE CO.LTD. , https://www.jstongdetrade.com
So how is this process handled? What is the process of the truss floor board? Next is the Yufa Pengxiang Building Board for everyone, the details are as follows:
First of all, the organization of labor should be divided into two groups. The first group is responsible for transporting materials, including clearing and back-transportation, until the truss floor slabs are accurately transported to the construction site according to the progress of the construction. There are five people together with the hoisting workers; The second group is only responsible for paving, can see the ribs, cutting, paving and leaving holes. Every three people are a group, responsible for one section, and four groups are working together at the same level of work.
First, the center line of the steel beam should be ejected in the place where the pavement is placed. The center line of the main beam is the control line for determining the seat when the truss floor is supported. By connecting the center line of the main beam, the width of the steel beam is manipulated, and the portion of the welded joint between the welds is also determined. The centerline of the secondary beam determines the position of the stud. Since it does not observe the specific part of the flange of the secondary beam after paving, the center line of the secondary beam and the width of the flange are rebounded on the center line of the main beam. When fixing the stud, it is necessary Re-bounce the centerline and the width of the flange to the top of the truss floor. Yufa Pengxiang Building Board, explain the knowledge of the truss floor board every day, pay attention to the Yufa Pengxiang floor board, and learn more about it. Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn