Recessed LED Downlight with built-in Microwave Motion Sensor
Solar Power,Solar Portable Power Station,Solar Power Panels,Solar Portable Power Station Camping JIANGMEN MOSCOT OPTOELECTRONIC TECHNOLOGY CO.,LTD. , https://www.zjsensorsled.com
According to the requirements of the National Development and Reform Commission, the key coal price for 2011 will be implemented at 2010 prices and may not rise in any form. However, it cannot be ignored that the price difference between the key contract coal price and the market electricity coal price still exists. At present, although the Bohai Sea thermal coal price index has fallen for three consecutive weeks, the overall decline is not large, and coal prices are still at a high level.
The industry believes that the follow-up power companies will face the problem of contract redemption rate. Compared with the signing of the contract is not enough, the contract can not be honored, it is more unacceptable for power companies. From the implementation of previous years, the National Development and Reform Commission must come forward to reaffirm the importance of the redemption rate when coal prices enter the rising channel. Compared with the mandatory intervention of administrative means, both coal and electricity should be based on the fairness and good faith of the market economy. Receive attention.
Model
AM-6.0GY
Luminous flux
800~900lm
Luminous Efficacy
>80lm/W
Colour Rendering index
80
Beam Angle
140°
Light Decay
<30% over 10,000 hours
Rated Lifespan
>30,000 hours
Power consumption
10 watts
Input voltage / Frequency
80-260vac 50-60HZ
Reflector / Diffuser
Frosted diffuser
Operating Environment
-20°c~+50°c
Dimensions
Φ193*77mm
Hole Cut Size
Φ160~Φ180mm
LED Source
56pcs SMD2835
Working mode
ON/OFF or Full/Dim
Sensor Range
180*360 degree
Sensor Distance
6-8m Radius
Delay Time
18-25s
The deadline for the 2011 national coal production and transportation needs contract is stipulated by the National Development and Reform Commission. The coal transportation and marketing association website information shows that as of 13:00 on December 30, 2010, the national coal production and transportation needs contract has been preliminary summarized in 2011. 112,904.74 million tons, has far exceeded the total transportation capacity of 932 million tons. However, in the face of contracts signed under price limits, power companies are not optimistic about the contract redemption rate.
Specifications