Cement cabinet construction steps

1, according to their own size of the size of the kitchen (to be considered after the thickness of the tile).

2, design drawings. Including the height and width of the cabinet, several cabinet doors, width dimensions (as far as possible to maintain unity), the location of the partitions, the location of the sink and the stove opening (water should be taken into account, not too far apart), the drawer basket position And so on, the finer the former, the better, and the less regret there will be.

3, hydropower section. According to the layout of their own kitchen, drawings of cabinets, arrange the location of water and electricity. The height of the hood, the location of the hot and cold water pipes, and the location of the sink and other outlets should fully consider the location of the outlet. I had a low outlet at that time and waited until the master of the bricklayer came to see it. It happened to be at the level of the cabinet's cement board. There was no way to go back to the line too high.

4, bricklayer part (here to include the installation of the partition). It is best to contact bricklayers in advance and take a good look. The concrete cabinet part looks very simple, but the size requirements are very strict, the cement boards should be horizontal, the support boards should be vertical, and each one should be kept parallel, otherwise the drawers would not be easy to install. , so that the requirements for the tile master is relatively high.

Installation of partitions. Allow the tile master to cut the tiles, measure the height, install the partitions, and leave the hinges in place. Another point I ignored at the time was that the concrete board set a hole in the direction of the natural gas pipe. I was looking for a hole in the worker's electric drill.

5, the installation part. Door installation. It was difficult to find workers to help with the installation of the cabinet doors in advance. A carpenter measures the size and orders the doors. Doors have blister, crystal, paint, and so on, they can go to test, tailor.

Countertop installation. Requires the size of the countertop installation master. If the concrete cabinets are made to be precise and perfect, then do the benchtop installation. Since the spacing between the sinks and stoves in the cabinets of our cabinets is not well-spaced, the outer edges of the sinks are narrow and narrow, and the workers have to spend a lot of energy when installing them. The cutting machine is used to cut out part of the interior of the stove holes along the cement board, and then Only installed.

Cement Cabinet Hidden Trouble

1, the tile and the support board against the wall need to pay attention

The tiles need to leave a gap with the wall so that the tiles are aligned with the middle part of the steel and the steel close to the wall

2, the sink, stove opening spacing problem

For the sink, stove opening must be in accordance with the size, otherwise it is not easy to handle later.

The relevant information about cement cabinets was introduced here for everyone. I hope this article will be helpful to everyone. If you still have something you don't understand, you can leave a message to Xiaobian at the bottom. We will answer your questions as soon as possible.

Cabinets Kitchen Cabinets Custom Cabinets Drawers Cabinets Doors Doors Kitchen Cabinets Doors Tiles Price Kitchen Tiles

LED Strip Light

Led Strip Light,Rgb Led Strip Lights,Smart Led Strip Lights,Color Changing Led Strip Lights

Guangdong Smart Street Lighting Co., Ltd , https://www.fldlight.com