Conveyor belt maintenance steps are as follows:
1. Mesh conveyors should be guarded by fixed personnel during the work process. It is necessary for the guard to have general technical knowledge and a comparative understanding of the function of the conveyor.

2. The company should draw up the "safety operation regulations for equipment maintenance, repair, and maintenance" for the conveyors so that the guards can observe them. The guards must have the principle of shifts. 3. The feeding to the belt conveyor should be uniform, and the feed hopper must not be filled with excess material to overflow the material hopper.

4. During the operation of the conveyor, non-guards must not approach the machine; any personnel must not touch any rotating parts. When there is a seizure defect, it is necessary to work intermittently to eliminate the defect. If there are defects that are not immediately eliminated but have no impact on the work, records should be made and eliminated when the repairs are made.

5, guarding the conveyor, you should always check the working conditions of the various parts, check the bolts everywhere, found loose and tighten in a timely manner. However, it must prevent the conveyor from working and cleaning and repairing the working parts of the conveyor.


6. The screw tensioning device of the tail device should be adjusted properly, insisting that the conveyor belt has normal working tension. The guards should always check the working conditions of the conveyor belt. Some damaged areas should be considered as damaged (whether it is an effect on the production) or not, and whether the replacement should be replaced immediately or be replaced. The removed conveyor belt should be used for other purposes depending on its degree of wear.

7, guarding the belt conveyor is to check its working conditions, cleaning, lubrication and inspection and adjustment of screw tension equipment and other scattered work.

8, mesh belt conveyor under normal circumstances should start when no load, parked after the material unloading.

9. In addition to insisting on normal lubrication and dismantling of single damaged parts during use, the conveyor must be repaired once every 6 months. When repairing, it is necessary to eliminate defects in use and records, replace damaged parts and replace lubricating oil, etc.

10. The company can develop repair cycles based on the working conditions of the conveyor.