Variable ratio bridge tester using method

Variable ratio bridge tester using method

In 2015, the transition period of Kunming City will be shorter than that of the bridge tester . In the flood season, there will be more precipitation. In some areas, there may be obvious meteorological disasters such as heavy rain and strong thunderstorms and their derivative disasters. In 2015, it will focus on preventing and controlling natural disaster risks such as large-area water accumulation in urban areas, low-lying substation hydropower stations, landslides and landslides, and mudslides.

The flood prevention emergency organization system was perfected. The Kunming Bureau issued the Notice on Adjusting the Kunming Power Supply Bureau Flood Control Leading Group Member, and set up a flood prevention leading group headed by the Director General. In addition, a leadership agency for flood prevention was established in each grass-roots unit with the chief administrative person in charge as its leader, and the responsibilities for flood prevention at all levels of the grass-roots unit were clearly defined. According to the inspection results of the previous phase of flood prevention and anti-destruction tests , the Kunming Bureau arranged 10 power transmission, transmission, and distribution flood control and flood prevention projects, mainly for substation drainage ditch dredging, wall repair, power transmission, transmission line tower tower retaining walls. , Gutter clearance, etc., has completed 75% of the project volume, all projects are scheduled to be completed by May 30th.

In addition, the Kunming Bureau also adopted the following major measures to ensure flood prevention and flood prevention in the rainy season: First, implement a responsibility system for implementing flood prevention and flood prevention projects, accelerate the progress of project implementation, and increase equipment flood control capabilities. The second is to establish a flood prevention emergency linkage mechanism. In order to obtain accurate information on geology, hydrology, etc., and establish a flood prevention information sharing mechanism, it communicated and communicated with the government emergency agencies, meteorology, water conservancy, and flood prevention and drainage command agencies in advance. The third is to carry out the government-enterprise negotiation for preventing floods and floods in comparison with the bridge tester , identify the hidden dangers of electricity hidden in the 242 water points identified by the government, and adopt reinforcement and special inspection measures. Fourthly, in conjunction with equipment inspections, the Bank carried out flood and flood prevention and geological safety hazard investigations in the same period, and carried out substations, power distribution stations, cable tunnels, landslides, and flood erosion areas in the low-lying areas, construction sites for infrastructure and production projects, and hydropower plants. Special inspections and hazard risk assessment of dam-related lines, and timely disposal of factors affecting safety. The fifth is to fully prepare for the emergency. Equipped with 19 teams of 999 professional emergency rescue teams and five types of emergency supplies to ensure that the team pulls out the emergency situation and supplies are available. Sixth, strict implementation of flood prevention duty watch system. It is scheduled that the enthalpy change is longer than the bridge duty meter with public holiday days and holidays, and 24-hour communication is maintained during the shift.

DC Motor Peristaltic Pump

We have a series of OEM Small Peristaltic Pump for this type of pump.

DC12v or DC24v connected to wp110 pump head, with a 0-18.5ml/min flow rate

DC12v or DC24v connected to YZ1515x pump head, with a 0-2280ml/min flow rate

DC12v or DC24v connected to KZ25 pump head, with a 0-6000ml/min flow rate

DC12v or DC24v connected to YZ35 pump head, with a 0-12000ml/min flow rate


This group includes small DC motor peristaltic pumps, a DC motor, a pump head, be contacted with a connecting board.
their structure is compact, and easy to install, with matching vending machines, packing machines, mining machines, food, and pharmaceutical machine, we customized DC supply power motors.

DC Motor Pump,DC12v Peristaltic Pump,DC24v Peristaltic Pump,OEM Peristaltic Pump

Baoding Chuangrui Precision Pump Co., Ltd. , https://www.chuangruipump.com