Power Tool Spare Parts Armatures for Hammer 13 Impact Drill

Model NO.: Hammer 13
Trademark: Shinsen
Specification: 0.8KG
Origin: Jiangsu, China
Model NO.: Hammer 13
Trademark: Shinsen
Specification: 0.8KG
Origin: Jiangsu, China
Armatures For Hammer 13
Power Tool Spare Parts Armatures for Hammer 13 Impact Drill
For Hitachi VTP13
For AEG 420W(PN2000N)
For AEG 600W(SB2-16)
For AEG 500W(SB2-500)
For Changchun AEG
For Bosch 550W(GSB550-2)
For Metabo 420W(4gears)
For Metabo 600W(6gear)
For Metabo 600W(7gear)
For Makita 1600
For Bosch 18-2
For Hammer 13
For black&Decker BD353
For ACC13



Power Tool Spare Parts Armatures for Hammer 13 Impact Drill


During the time of using product, our company will organize technical staff and inspectors to consult users on product quality, usage status, and improvement opinions so that we can improve better product quality.


OUR SERVICES:
1) Quality & Service: We take care of the product quality in order to provide good service to our customers.
2) Price: In order to serve better to our customer we are always finding the way to reduce the price.
3) Special Service: In this competitive world we always provide a promotion offers to our customer so our customer can able to save a good amount.
 
OUR ADVANTAGES:
1) MOQ: We can supply you the quantity you want.
2) OEM: We can produce the goods as per the customer requirement.
3) Service: We are much more concern for the ON TIME DELIVERY & QUALITY. 

FAQ
1.What is your MOQ?
Different model has different MOQ..

2.Can I use my own logo and design on products?
YES, OEM is welcomed.

3.How long is the delivery time?
A:2-7 days for the sample order.
B:20-30 days for LCL or FCL order.

4. Q: Can I get some samples? 
A: We are honored to offer you samples for quality check.

5. Q: Do you have the products in stock? 
A: Yes, We have sample for several models now could supply to you.

6. Q: What's the delivery time?
A: It usually takes about 45 days to produce an order from MOQ to 20FT container. But the exact delivery time might be different for different orders or at different time.

7. Q: How does your factory do regarding quality control? 
A: Quality is priority. People always attach great importance to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully tested before it's packed for shipment. Armatures For Hammer 13
Power Tool Spare Parts Armatures for Hammer 13 Impact Drill
For Hitachi VTP13
For AEG 420W(PN2000N)
For AEG 600W(SB2-16)
For AEG 500W(SB2-500)
For Changchun AEG
For Bosch 550W(GSB550-2)
For Metabo 420W(4gears)
For Metabo 600W(6gear)
For Metabo 600W(7gear)
For Makita 1600
For Bosch 18-2
For Hammer 13
For black&Decker BD353
For ACC13



Power Tool Spare Parts Armatures for Hammer 13 Impact Drill


During the time of using product, our company will organize technical staff and inspectors to consult users on product quality, usage status, and improvement opinions so that we can improve better product quality.


OUR SERVICES:
1) Quality & Service: We take care of the product quality in order to provide good service to our customers.
2) Price: In order to serve better to our customer we are always finding the way to reduce the price.
3) Special Service: In this competitive world we always provide a promotion offers to our customer so our customer can able to save a good amount.
 
OUR ADVANTAGES:
1) MOQ: We can supply you the quantity you want.
2) OEM: We can produce the goods as per the customer requirement.
3) Service: We are much more concern for the ON TIME DELIVERY & QUALITY. 

FAQ
1.What is your MOQ?
Different model has different MOQ..

2.Can I use my own logo and design on products?
YES, OEM is welcomed.

3.How long is the delivery time?
A:2-7 days for the sample order.
B:20-30 days for LCL or FCL order.

4. Q: Can I get some samples? 
A: We are honored to offer you samples for quality check.

5. Q: Do you have the products in stock? 
A: Yes, We have sample for several models now could supply to you.

6. Q: What's the delivery time?
A: It usually takes about 45 days to produce an order from MOQ to 20FT container. But the exact delivery time might be different for different orders or at different time.

7. Q: How does your factory do regarding quality control? 
A: Quality is priority. People always attach great importance to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully tested before it's packed for shipment.